Example shipping plans showing how air, ocean, rail, FBA and project shipments from China are planned — routes, cargo, example timelines and preparation, step by step.

Every scenario below is an illustrative example. Shipment details and timelines are examples, not verified client results.

Shipping ScenarioAir Freight

Seasonal Apparel Air Freight from China to the USA

Air consolidation of 80 cartons / 4,000 garments from several Guangzhou suppliers to a Los Angeles warehouse, planned inside a 7–10 day door-to-door window.

Route: Guangzhou → Los AngelesCargo: 80 cartons · 4,000 pcsWindow: 7–10 days door-to-door
View shipping scenario →
Shipping ScenarioOcean FCL

FCL Furniture Shipping from China to Germany

One 40' high-cube of flat-packed furniture — 210 sets / 58 CBM — stuffed at Foshan, shipped via Yantian to Hamburg and trucked to a German warehouse inside a 40–50 day planning range.

Route: Foshan → HamburgCargo: 420 cartons · 58 CBMWindow: 40–50 days door-to-door
View shipping scenario →
Shipping ScenarioAmazon FBA (DDP)

DDP Sea Shipping for Amazon FBA Inventory to the USA

Duty-paid FBA replenishment — 150 cartons / 6,000 battery-free units — consolidated in Shenzhen, shipped by sea and delivered on appointment to the assigned US fulfillment center in 30–40 days.

Route: Shenzhen → Amazon FC, USACargo: 150 cartons · 12 CBMWindow: 30–40 days to check-in
View shipping scenario →
Shipping ScenarioRailway Freight

Railway Freight for Machinery Parts to Poland

18 pallets of non-hazardous machinery parts — 9,200 kg / 24 CBM — from Suzhou onto a China–Europe rail service via Xi'an and Małaszewicze, delivered to Warsaw in 25–35 days.

Route: Suzhou → Warsaw (rail)Cargo: 18 pallets · 24 CBMWindow: 25–35 days door-to-door
View shipping scenario →
Shipping ScenarioProject Logistics

Oversized Project Cargo Shipping to the UAE

Out-of-gauge generation equipment and steel frames — 3 packages, 18,500 kg, largest piece 6.2 × 2.8 × 3.1 m — moved from Shanghai to a UAE project site in 25–35 days under an engineering-led lift and lash plan.

Route: Shanghai → Dubai siteCargo: 3 packages · 18,500 kgWindow: 25–35 days to site
View shipping scenario →